Federal Pacific Electric Panel Replacement Cost
But many homes built between the 1950s and 1990 still have electrical circuit breakers with stab lok panels made by the defunct company federal pacific.
Federal pacific electric panel replacement cost. This information on electrical panel replacement costs suipports our articles describing hazards leading to the need to replace federal pacific stab lok electric panels or zinsco zinsco sylvania electric panels in buildings. The inspection would be more expensive than the federal pacific electric panel replacement cost altogether. With an electrician s hourly rates at 40 to 100 hour and with the first hour costing 75 to 120 you can expect to spend between 400 and 800 for labor costs. Federal pacific panels also known as fpe panels were a popular residential electrical panel choice in the mid to late 20th century.
However the replacement of the panel often is accompanied by other repairs to meet current electrical codes. Replacement of the federal pacific electric panel known as a stab lok circuit breaker is happening across the country. Most homeowners can sleep soundly knowing their electric panels will protect them by tripping off when a circuit overload occurs. Thanks for sharing a smart thought.
So how much does it cost to replace a federal pacific stab lok breaker panel. Learn why when to replace yours. The cost to replace a federal pacific or zinsco panel ranges from 1 500 to 4 000. Option 2 federal pacific electric panel removal and replacement with a new brand x electrical panel is likely to cost twice as much as option 1 with the ch replacement load center and electrical panel enclosure adapter.
Option 2 can be expected to require at least twice the labor of option 1. Why you should replace federal pacific electric stab lok panels access doors and panel january 3 2020 at 9 58 am. They have design flaws that could cause a house fire. The panel was well known in the building community as a cheaper alternative to some of the more recognizable panel companies such as general electric i t e and square d.
A home with one of these panels you should have the panel replaced. Cost to replace or install an electrical panel. Since these are older systems this includes some upgrades to wiring. 7 thoughts on alert.
Stab lok panels may not trip thus posing a fire hazard. This document discusses the typical costs to replace an electrical panel. Usually the replacement of a federal pacific stab lok breaker panel costs about 1500 2000. Electrical panel replacement typically takes 8 to 10 hours which includes 200 amp capability a new panel with main breaker and ten circuit breakers labor and all required materials.
The biggest cost for most electrical work is labor.